Working with Envirowaste we developed the layout for their new Hazardous Waste Treatment upgrade for the site in Miami Parade. The new development included Chemical Treatment Building, Main Process Building and support of tanks and plant.
Ground conditions required the buildings and slabs to be supported off driven timber piles. The main process building was designed with steel portal frames, precast concrete push pull walls and a concrete slab suspended off the timber piles. Inground concrete receiving pits and a separator pit were incorporated into the main process building.