Greenwoods Corner
Greenwoods Corner Located within the busy Greenwoods Corner this new development has 3 retail units and 2 apartments above. It was designed in keeping with
Greenwoods Corner Located within the busy Greenwoods Corner this new development has 3 retail units and 2 apartments above. It was designed in keeping with
Mega Mitre 10 Stores Since 2012 Thorburns has been working with Mitre 10 as their lead consultants. We have worked on over 40 projects including
Pinehill Countdown Thorburns have just completed the structural design of this retail development including large format supermarket, single level and two level retail for Hugh
Rolls Royce Showroom Thorburns provided the structural design for the new Rolls Royce Showroom fit out.
Renault Showroom Thorburns completed seismic assessment and alterations to the existing building for the new Renault Showroom in Greenlane. Works included new roof, exterior cladding,
Team Mc Millan BMW Thorburn Consultants has worked in several refurbishments of the two existing buildings creating new façade, lift and mezzanine floor extensions.
Thorburns completed seismic assessment and alterations to the existing building for the new Renault Showroom in Greenlane. Works included new roof, exterior cladding, lift and stairwells and mezzanine floor to support cars. In 2021 Thorburns have completed the design for a new refurbishment works for a new car brand which is under construction.
Located within the busy Greenwoods Corner this new development has 3 retail units and 2 apartments above. It was designed in keeping with the local architecture maintaining the existing timber framed gable façade and adding a modern feel with glass and feature wood grained concrete panels. Supporting the large precast panels over the shop front glazing gives a feeling of suspension to the structure. Suspending the rear carpark and smaller retail building also allowed the site to be fully developed above the council overland flow path
Since 2012 Thorburns has been working with Mitre 10 as their lead consultants. We have worked on over 40 projects including new stores and alterations to the existing stores.
Thorburns provides drawings for Resource Consent, coordinating the site plans, building layout and elevations with Mitre 10 and other consultants. We complete detailed design for Building Consent and Tender coordinating design elements with the geotechnical, fire and mechanical engineers and prepare and lodge the Building Consents applications.
Thorburn Consultants has worked in several refurbishments of the two existing buildings creating new façade, lift and mezzanine floor extensions.
Thorburns provided the structural design for the new Rolls Royce Showroom fit out.